Equipment with Operator
|
|
Dozers |
Komatsu D-41

$125.00/hr
|
Caterpillar
D-5

$125.00/hr
|
Caterpillar
D-6

$138.00/hrCaterpillar D-7
$190.00/hr
|
Caterpillar
D-8

$250.00/hr |
Loaders |
Backhoes |
Caterpillar
963

$138.00/hr |
Komatsu Backhoe

$94.00/hr |
Excavators |
Komatsu PC200

$125.00/hr
|
Komatsu PC300

$156.00/hr
|
Komatsu PC400

$190.00/hr |
|
Rollers |
Ingersoll-Rand
DD24 2-ton(Asphalt)

$50.00/hr
|
Caterpillar
815 (12 ton)
$94.00/hr
|
Caterpillar
Sheepsfoot (12 ton)
$94.00/hr |
Ingersoll-Rand SD100
$94.00/hr |
Motorgraders |
Pavers |
Volvo Motorgrader

$150.00/hr |
Leeboy 8500
paver

$495.00/hrIncludes 2 operators, 1 roller, 2 loop men,
1 shovel man, 1 foreman |
| RAMAX with
operator |
$63.00/hr |
| Jack Tamp |
$50.00/hr |
| Mini Excavator |
$100.00/hr |
| Tractor with attachment |
$75.00/hr |
| Tractor &
Strawblower |
$94.00/hr |
Truck with Driver |
| Off-road dump
trucks |
$150.00/hr |
| Kenworth quad
axle dump truck |
$82.00/hr |
| Tandem axle dump Truck |
$57.00/hr |
| Kenworth
tractor with lowboy |
$140.00/hr |
| Kenworth
tractor with dump trailer |
$120.00/hr |
|
Labor |
| Project
manager/Principal |
$95.00/hr |
| Office
administration |
$65.00/hr |
| Grade foreman |
$48.00/hr |
| Equipment
operator |
$35.00/hr |
| Superintendent |
$48.00/hr |
| General
laborer |
$33.00/hr |
|
Services |
| Construction layout
(2 person crew) |
$140.00/hr |
| Service
truck/mechanic |
$136.00/hr |
| Crew truck
(Foreman, 2 laborers, no equipment) |
$136.00/hr |
|
Power Equipment |
Walk behind
cut saw
Minimum 4 hours |
$62.00/hr |
Portable
concrete saw
Minimum 4 hours |
$52.00/hr |
Sump pump 3"
Minimum 4 hours |
$45.00/hr |
Plate tamp
Minimum 4 hours |
$45.00/hr |
| Chainsaw |
$52.00/hr |
| 4" Trash pump |
$68.00/hr |
| 6" Trash pump |
$98.00/hr |
|
Mobilization |
| $300 In/out
per each piece of equipment |
|
Erosion Control |
| Construction
Entrance |
$3,000.00 each |
Standard size |
| Silt Fence |
$3.00/lf |
|
| Tree
Protection Fence |
$3.00/lf |
With signage |
| T.P./S.F.
Removal & Repair |
$3.00/lf |
No addl. silt
removal |
| Diversion
Ditches |
$2.00/lf |
|
| Sediment
Basins |
Call |
Per size and
design |
| Level
Spreaders |
Call |
Per size and
design |
| Check Dams |
$300.00 each |
|
| Inlet
Protection |
$300.00 each |
HWD cloth &
#57 stone |
|
Grading |
| Topsoil
Stripping |
$2.50/cy |
|
| Re-spread
Topsoil |
$2.00/cy |
|
| Common
Cut/Fill |
$3.25/cy |
|
Excavate &
Stockpile On-site Useable fill
no hauling |
$3.25/cy |
|
| Cut, haul and
remove to an on-site stockpile unsuitable material |
$6.50/cy |
Haul distance
limited |
| Haul and place
from on-site stockpile suitable fill |
$6.50/cy |
Haul distance
limited |
| Fine Grading |
Call |
No import or
export |
| Fine Grading
Curb |
$10.00/lf |
|
| Backfill Curb |
$1.00/lf |
|